A fibre modified concrete for backfilling around manhole frames and catch basins and can also be used for surface repairs.

  • Fibre modified
  • Rapid set
  • Open to traffic: 60 minutes
  • Workability: 5-10 minutes
  • Set time: 10-20 minutes even at minus temperatures
  • Depth: 30-500mm
  • Compressive strength after 90 minutes 20 MPa
  • PSI final strength 65 MPa
  • Shrinkage compensated

Packaging: 25kg / 55lb

Get in Touch